Public Comment Period Opens: Duke Energy Progress, LLC-NPDES Wastewater Permit NC0003417 H.F. Lee Energy Complex

-
Add to calendar:
Google Outlook iCal

N.C. DEPARTMENT OF ENVIRONMENTAL QUALITY INTENT TO ISSUE NPDES WASTEWATER DISCHARGE PERMIT #NC0003417
Public comment or objection to the draft permit is invited. All comments received by January 16, 2025, will be considered in the final determination regarding permit issuance and permit provisions.


PERMIT APPLICATION
Duke Energy Progress, LLC, 526 South Church St., Charlotte, N.C., has applied for a Renewal of its NPDES wastewater permit (NC0003417) for H.F. Lee Energy Complex, 1199 Black Jack Church Rd., Goldsboro, Wayne County. The facility discharges industrial wastewater, groundwater, and stormwater to Neuse River in the Neuse River basin. Some parameters are water quality limited. This discharge may affect future allocations in this portion of the Neuse River basin. The location of Outfall 001 is: Latitude: 35°22’16”; Longitude: 78°004’09”. The location of Outfall 002 is: Latitude: 35°22.09”; Longitude: 78°05.06”. The location of Outfall 002A is: Latitude: 35°22’18”; Longitude: 78°03’54”.

The draft wastewater permit and related documents are available online at: https://deq.nc.gov/public-notices-hearings. Printed copies of the draft permit and related documents may be reviewed at the department’s Washington Regional Office. To make an appointment to review the documents, please call (252) 948-3939.
Public comment on the draft modification should be mailed to: Wastewater Permitting, 1617 Mail Service Center, Raleigh, N.C., 27699-1617.


Public comments may also be submitted by email to: publiccomments@deq.nc.gov. Please be sure to include “Lee” in the email’s subject line.

Public Notice will run in The Goldsboro News-Argus on 12/12/2024
Comment Period Opens: 12/12/24
Comment Period Ends: 01/16/24