General Permits
General Permits
Title V Facilities
Under 15A NCAC 02Q .0509, DAQ may issue a permit to cover numerous similar facilities or sources provided the following conditions are met:
- There is no difference between the facilities or sources that would require special permit conditions for any individual facility or source; AND
- No unique analysis is required for any facility or source covered by the permit.
General permits issued under 02Q .0509 shall identify criteria by which facilities or sources may qualify for the permit. To facilities or sources that qualify, the Director shall grant the terms and conditions of the permit.
NOTE: If you apply for and receive a General Permit, you will be subject to enforcement action for operating without a permit if your facility or source is later determined not to qualify for the terms and conditions of the General Permit.
Sources subject to Title IV shall not be eligible for a permit issued pursuant to this Rule.
If your facility or source qualifies for a General Permit issued pursuant to 02Q .0509, you shall apply for coverage by the terms of the permit issued pursuant to 02Q .0509 or shall apply for a standard permit for each facility or source pursuant to 02Q .0500.
General Permits issued pursuant to 02Q .0509 are not required to undergo the public participation procedures pursuant to 15A NCAC 02Q .0521.
Source | Document |
---|---|
New Air Curtain Incineration (ACI) Units only burning the following:
|
Commercial and Industrial Solid Waste ACI Units Subject to NSPS Subpart CCCC
Other Solid Waste ACI Units Subject to NSPS Subpart EEEE
|
Existing Air Curtain Incineration (ACI) Units only burning the following:
|
Existing ACI Units Subject to 15A NCAC 02D .1904
|
Title V Application Form/Checklist (.pdf) (.docx) |
Non-Title V Facilities
Under 15A NCAC 02Q .0310, DAQ may issue a permit to cover numerous similar facilities or sources provided the following conditions are met:
- There is no unique difference that would require special permit conditions for any individual facility; AND
- No unique analysis is required for any facility covered under the permit.
General Permits issued under 02Q .0310 shall identify criteria by which facilities or sources may qualify for the permit. The Director shall grant the terms and conditions of the permit to facilities or sources that qualify.
NOTE: If you apply for and receive a General Permit, you will be subject to enforcement action for operating without a permit if your facility or source is later determined not to qualify for the terms and conditions of the General Permit.
Source | Document |
---|---|
Emergency Generators |
Application Forms (.pdf) (.doc) |
Cotton Ginning |
Application Forms (.pdf) (.doc) Sample Permit (.pdf) |
Yarn Spinning Plants |
Application Forms (.pdf) (.doc) Sample Permit (.pdf) |
Concrete Batch Plants |
Application Forms (.pdf) (.doc) Sample Permit (.pdf) Sample Permit Review (.pdf) Concrete Production Modeling Rates (.pdf) (February 12, 2015 AQAB Memo)
|