Donate to Hurricane Recovery

Collection Systems

Engineering Certification "Roundup"

Recently, the PERCS Unit sent out letters to approximately 700 Permittees requesting updates for approximately 1,200 permits which our database shows do not have final engineering certifications, for permits originally issued between January 2010 to December 2015. We anticipate eventually following up on permits dating back to 2002.

 

If you have a permit for which you are unsure of the certification status, please use the Sewer Extension Permit Tracker link below to check our database for more information. Note that the review of responses to the letters sent out in May are taking approximately 10-15 business days due to the influx of responses.

Please direct any inquiries regarding this outreach project, including the submittal of certification documents and permit rescission requests, to Nyle Hothem at Nyle.Hothem@ncdenr.gov or (919) 707-9130.

 

Engineering Certification Template (Updated June 2019)

Response Form Template (Updated June 2019)

 

Latest News:

The 02T Rules have been updated as of September 1, 2018.

Revised SSO Reporting Requirements (Updated October, 2014)

Underground Utility Safety & Damage Prevention Act  (Updated October, 2014)

  • Requires underground infrastructure to be "electronically locatable"

Sewer Extension Application Tracker

  •  Information related to the review for applications received by the Division

Sewer Extension Permit Tracker

  • Information related to issued permits, including the receipt of Final/Partial Certifications
  • Enter the "Issue Date" at the top of the "Engineering Certification" form for modified permits (those with multiple versions)
  • Enter today's date to give information for the latest permit version issued

Subscribe to Collection System Updates

Wastewater Collection Systems

The Pretreatment, Emergency Response, and Collection System (PERCS) unit administers various wastewater collection system permitting programs for the Division. The PERCS unit issues system-wide collection system permits (WQCS Permits), flow reduction requests, and name change /change of ownership requests. The unit is responsible for the review and approval of local programs for permitting construction, modification, and operation of public and private sewer system in their utility service areas (i.e. delegation) pursuant to G.S. 143-215.1(f). The unit also administers general oversight of the fast track sewer extension program which issues sewer extension permits through the seven regional offices. 

Programs Administered:

  •    Fast Track Program (Gravity Sewer, Pump Stations, & Force mains)
  •    Standard Sewer Extension Permitting Program
  •    System-Wide Collection System Program
  •    Local Programs for Sewer Systems (Delegated Program)

Rules and Guidance: