Skip to main content
NC DEQ logo NC DEQ

Topical Navigation

  • Home
  • Divisions
    Divisions
    • Air Quality
    • Coastal Management
    • Energy, Mineral, and Land Resources
    • Environmental Assistance and Customer Service
    • Environmental Education and Public Affairs
    • Marine Fisheries
    • Mitigation Services
    • Waste Management
    • Water Infrastructure
    • Water Resources
  • Permits & Rules
    Permits & Rules
    • Permit Directory
    • State Environmental Policy Act (SEPA)
    • Express Permitting
    • DEQ Forms
    • Permit Assistance and Guidance
    • Rules & Regulations
    • Enforcement
    • NC DEQ ePayments
    • DEQ Permitting Transformation Program
    • Environmental Application Tracker
    • Pre-Regulatory Landfills Map
    • Title VI Compliance
    • Risk-Based Remediation
  • Outreach & Education
    Outreach & Education
    • N.C. Environmental Education
    • Distance Learning - Environmental Education
    • Environmental Justice
    • Educator Resources
    • Recognition Programs
    • Public Involvement Programs
    • Training
    • Recreation
    • Research
    • Grants
    • Conservation
    • Recycling
  • Energy & Climate
    Energy & Climate
    • Energy Group
    • Climate Change
    • Community Solar
    • Energy Assurance
    • Energy Efficiency and Weatherization
    • Energy Resilience
    • Transportation
    • Workforce Development
    • Offshore Wind Development
  • News
    News
    • Press Releases
    • Public Information Contacts
    • Environmentally Speaking Blog
    • Public Notices & Hearings
    • Events
    • Key Issues
    • DEQ Dashboard
    • Legislative Reports
    • Requesting Public Records
  • About
    About
    • Our Mission
    • Leadership
    • Boards and Commissions
    • Divisions
    • Green Square
    • Contact
    • Work at DEQ
  • NC.GOV
  • AGENCIES
  • JOBS
  • SERVICES
NC DEQ »   About »   Divisions »   Energy, Mineral, and Land Resources »   Stormwater »   Stormwater Program »   Post-Construction Program »   New Permits & Permit Modifications

New Permits & Permit Modifications

To apply for a new permit or a permit modification:

  1. Design the project to meet the requirements of the post-construction program that applies.  Consult the webinar How to Breeze Through Your Post-Construction Plan Review for guidance on how to prepare a compliant Post-Construction permit application.
  2. Select one of the Permitting Options (see below). 
  3. Complete all of the required forms and prepare all of the required documentation. 
  4. Submit the project to the appropriate office for review. Be sure to send the application to the appropriate DEMLR office.

Application Forms

New Permit & Major Modification Form with New Permit & Major Mod Instructions
For new projects or modifications to a project that do not qualify as minor modifications.  Fee varies depending on permitting option selected.  
Fast Track Authorization (ATC) to Construct Form with Fast Track ATC Instructions
For new projects or major modifications to a project that meet the MDC to enter Step 1 of the Fast-Track Permitting Program.  Fee is $505 for Step 1 (ATC) and $505 for Step 2 (final permit).
Minor Modification Form                                                        
For modifications to a project with no built-upon area increases or changes to the stormwater control measure design.  No fee.
Permit Information Update Form                                                   
For administrative changes to project name, permittee contact info, legal corporation name not due to change of ownership.  No fee.  Check current contact information by running a State Stormwater Contact Summary Report.

Regardless of the option selected, be sure to send the application to the appropriate DEMLR office.

Permitting Options

Permitting_Option

Description and Fee Information

Standard

15A NCAC 02H .1042  

Per NC statute, DEMLR has 90 days from receipt of application to issue the permit or request additional information.  Reviews are usually done in 60 days or less.  ($505 fee, high density projects require a $505 renewal fee every 8 years)

To apply:  Complete a New Permit & Major Modification Form.  Provide all required items, including a completed Supplement EZ and O&M EZ (see the Stormwater Design Manual page.)  

Fast Track

ATC:
15A NCAC 02H .1043

Final:
15A NCAC 02H .1044

Fast track permitting is a two-phase permit process, the fee for each phase is $505.

To apply:  Complete a Fast Track Authorization to Construct Application. DEMLR does not conduct a detailed technical review at the ATC step. Instead, a qualified professional certifies that the project, once completed, will comply with the Minimum Design Criteria (MDC). DEMLR has 30 days from receipt of the ATC application to issue the permit or request additional information.

After the project is constructed:  Apply for the final permit using the New Permit & Major Modification Form.  Include as-built plans, calculations, certification forms, and other supporting documentation per the Fast Track Final Permit Submittal Checklist. 

If the finished project does not comply with the MDC, DEMLR will either issue a permit with special conditions, initiate compliance and enforcement action, or deny the permit. If the permit is denied, then the applicant will be required to bring the site into compliance with the MDC before the final permit is issued.

Express

DEQ Express Permitting

Express Permitting is only available for projects in the 20 Coastal Counties. This program offers quicker permit decisions. A pre-application meeting is required to ensure that the application will include supporting technical information needed for a thorough and swift review.

Higher Post-Construction Express Fees are charged to support additional staff needed for the quick turnaround.

To apply:  Submit an Express Request Form to the Washington or Wilmington Regional Office.  After the project is accepted, complete the appropriate form, being certain to provide all required items.  

 

Post-Construction Program

  • New Permits & Permit Modifications
  • Permit Transfers & Renewals
  • Post-Construction Forms
  • Post-Construction General Permits
  • Summary of Post-Construction Programs

Share this page:

  • Facebook
  • Twitter
  • Email

How can we make this page better for you?

Back to top

Contact Us

Physical Address
North Carolina Department of Environmental Quality
217 West Jones Street
Raleigh, NC 27603 Map It
877-623-6748

Mailing Addresses

Work for Us

  • Job Opportunities at DEQ
  • For State Employees
  • DEQ Intranet

Twitter Feed

Tweets by NC DEQ

Follow Us

  • Facebook
  • Twitter
  • Instagram
  • YouTube
  • LinkedIn
  • DEQ Employee Directory
  • Translation Disclaimer
  • Accessibility
  • Terms of Use
  • Privacy Policy
  • Open Budget
NC DEQ
https://deq.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater-program/post-construction