Funding Application Forms and Additional Resources

Funding application forms, guidance, and resource materials are available on this webpage for eligible entities interested in applying for funding for drinking water, wastewater, and/or stormwater projects. Applications are reviewed and presented to the State Water Infrastructure Authority for awards. 

o   Lead Service Line Replacement funding for drinking water systems (LSLR)

o   Emerging Contaminants Evaluation/Assessment Study Projects for PFAS-affected drinking water, wastewater, and publicly-owned landfills (DWSRF-EC Studies and CWSRF-EC Studies)

o   Decentralized wastewater treatment systems projects from the CWSRF Pilot Program (CWSRF DWTS Pilot Program)

Tab/Accordion Items

Priority Rating System Guidance and Forms are available at the tab above with that name

Application Form (select the appropriate application):

Financial Information Form (updated Feb. 23, 2026)

Spring 2026 Applications Affordability Calculator (updated Feb. 23, 2026)

Spring 2026  Viable Utility Eligibility Form  (updated Feb. 23, 2026)

  • Please note: For local government units who have been designated as distressed and/or may be designated as distressed in Spring 2026, we encourage you to complete and submit the Viable Utility Eligibility Form with construction applications so SWIA may consider a wider range of funding programs for your project. The form is a requirement for Viable Utility Reserve fund consideration.

 

Below are the forms and guidance on how to complete the application narrative to claim Priority Rating System (PRS) line item points. These are required as part of the application. Please select the appropriate one based on the type of application you are submitting.

Spring 2026 PRS Form and Guidance (by project type

PRS Form and Guidance (by project type) for the Rolling Application

Supplemental Guidance for the Ranking of Applications and for Providing Additional Information for Consideration

CDBG-I REQUIRED SUBMISSION DOCUMENTS

CDBG-I Applications require both a digital submission through the Division Submission Portal, and a mailed hardcopy original. Send the hardcopy via UPS/ Fedex to:

Application Address CDBG-I

INSTRUCTIONS 

 

FORMS FOR CDBG-I APPLICATIONS

TAB 1Updated
Resolution to Apply - DWI Template Feb. 2026
TAB 2Updated
Division of Water Infrastructure Application FormOn Application Tab
CDBG-I Interactive ScorecardJuly 2026
Commitment of Other FundsMarch 2017
TAB 3 Updated
Appendix A: Determining LMI January 2026
CDBG-I LMI Workbook Added May 2026
HUD Area-Benefit LMI Census  DataHUD Provided
2026 Income Limits June 2026
Income Survey Questionnaire Instructions March 2017
Income Survey Questionnaire (Spanish) May 2019
Income Survey Questionnaire  May 2021

TAB 4

TAB 5

TAB 6

TAB 7

TAB 8 Updated
Appendix B: Public Hearings12/2024
Appendix C: HUD Form Instructions 12/2024
Economic Needs- Infrastructure National Objective Form 7/2022
IDIS Forms: Accomplishments and Beneficiaries & Project Source and Use7/2022
Certification of Understanding Roles and Responsibilities of CDBG-I Program 12/2024
Conflict of Interest Disclosure Checklist 12/2024
Federal Performance and Procurement Requirements Certification 12/2024
Financial Disclosure Report 12/2024
Sam.gov Registration  
Federal Flood Risk Management Standard  

 

 

2026 Rolling Application Cut-Off Dates:

Rolling applications are only for 

  • lead service line identification and replacement projects, 
  • emerging contaminants (PFAS) evaluation/assessment study projects, and 
  • decentralized wastewater treatment system projects. 

Rolling applications can be submitted on any day here. Rolling applications received by 5:00 pm on the following dates will be considered for funding at the next State Water Infrastructure Authority meeting as listed below: 

Received by 5pm on June 1, 2026, will be considered at State Water Infrastructure Authority's July 15, 2026 meeting 

Received by 5pm on Aug. 3, 2026, will be considered at State Water Infrastructure Authority's September 16, 2026 meeting

Received by 5pm on Nov. 2, 2026, will be considered at State Water Infrastructure Authority's December 9, 2026 meeting

2027’s rolling application cut-off dates will be posted towards the end of the year.   

 

On This Page Jump Links
Off