Stormwater Electronic Data Monitoring Reports (eDMR)

EPA’s NPDES Electronic Reporting Rule requires all NPDES-permitted facilities to submit reports such as data monitoring reports and annual reports electronically rather than in paper. The rule changes only the method by which information is provided, not the content of the information that must be provided. 

Please visit the Wastewater eDMR web site if you need information about electronic reporting for an NPDES wastewater permit.

Benefits of eDMR

  • Saves time and resources by eliminating paper reports.
  • Provides a complete and accurate set of monitoring data on industrial facilities. This data can be used to update industrial permits going forward.
  • Brings DEQ and permittees into compliance with EPA’s NPDES Electronic Reporting Rule.

Deadlines

The Stormwater Program has begun bringing NPDES Stormwater Industrial permittees into eDMR between now and January 1, 2022.  NPDES Stormwater Industrial permit owners are required to complete Steps 1 and 2 of the Six Step Process by the following dates (in accordance with their permit types). 

If an industrial owner holds permits in two or more groups, then the earliest due date for Steps 1 and 2 will apply.  For example, an owner with coverage under an NCG020000 and an NCG140000 is required to complete Steps 1 and 2 by January 1, 2022.

If your industrial facility is not required to report analytical samples and does not foresee a need to do so in the near future, then you do not have to register for e-DMR. 

Group Industrial_Permits_in_this_Group Register in eDMR (Steps 1-2) Report in eDMR (Steps 3-5)
A NCS Individual  January 1, 2021 July 1, 2021
B NCG16 Asphalt Paving 
NCG17 Textile Mills 
NCG18 Furniture Manufacturing
NCG20 Scrap Metal
April 1, 2021 July 1, 2021
C

NCG06 Food & Kindred
NCG08 Transit & Transportation
NCG09 Paints and Varnishes
NCG10 Used Motor Vehicles
NCG12 Landfills

July 1, 2021 January 1, 2022
D NCG03 Metal Fabrication August 1, 2021 January 1, 2022
E NCG05 Apparel, Printing, Rubber
NCG07 Stone, Clay, Glass
September 1, 2021 January 1, 2022
F

NCG11 Treatment Works >1MGD
NCG13 Non-metal Waste/Scrap
NCG21 Timber Products

October 1, 2021 July 1, 2022
G NCG02 Mining Activities
NCG19 Marinas
January 1, 2022 July 1, 2022
H

NCG14 Ready-Mix Concrete
NCG24 Compost Operations 

March 1, 2022 July 1, 2022

How to Submit Paper DMRs Before eDMR is Implemented

System Requirements for eDMR

To use eDMR, a user must have:

  • A basic computer with adequate memory and resources for internet functions,
  • An internet connection and browser (Internet Explorer or Mozilla Firefox),
  • A PDF reader (Adobe Reader, Adobe Acrobat, or other available PDF reader), and
  • A valid email address.

Permittees who do not have the above items may submit an Application for Temporary Stormwater Electronic Reporting Waiver.

Six Step Process for Stormwater eDMR

The Six Step Process for Stormwater eDMR includes links to the required forms.  Permittees will receive a letter reminding them of their due dates.